Site visit details

Overview

Catchment Mallee
Site Margooya Lagoon - 1 MA_WMA100
Date and Time Monday 14th December 2009 10:53am
Approved Approved

Notes

Physical Chemical Tests

D.O mg/L EC µS/cm pH pH Units rP mg/L P Water ° C Turb NTU
Sample 0 41 6.94 23.42 1.1
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Water finished being pumped into lagoon 2 days prior - possible slight drop in level over this time. Pumping took place for 2 months, i.e. rising water level. Rainfall within last week.

Creatures Waterwatch method

Image Species Score Quantity
Total bug score
Total abundance 0 - 35 35+
0 - 200 Poor Good
200+ Fair Very good
Total abundance: 0 Total score: 0 Overall rating: Poor

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au