Waterwatch Data Portal
MA_DFO500 Foster Street Rehabiltaion Site 1 (Drain)
10 January 2010
Site visit details
Overview
Catchment | Mallee |
---|---|
Site | Foster Street Rehabiltaion Site 1 (Drain) MA_DFO500 |
Date and Time | Sunday 10th January 2010 09:20am |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
EC µS/cm | pH pH Units | rP mg/L P | Water ° C | Turb NTU | |
---|---|---|---|---|---|
Sample |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
not enough water to sample. Worm excavation at pine tree and drain blocked with debrs.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au