Site visit details

Overview

Catchment Tambo River
Site Nicholson River Backwater - Filmers Road Sarsfield EG_NIC040
Date and Time Tuesday 16th June 1998 12:45pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units Air ° C P mg/L Turb NTU
Sample 8600 6.65 0.045 25
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
This was the first sampling at this site. The river was quite full after recent rain following the drought lots of water lying in paddocks.

Creatures Waterwatch method

Image Species Score Quantity
Total bug score
Total abundance 0 - 35 35+
0 - 200 Poor Good
200+ Fair Very good
Total abundance: 0 Total score: 0 Overall rating: Poor

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au