Waterwatch Data Portal
EG_DAV030 Davis Creek - Pipeline (Watertrust) Road
6 September 2004
Site visit details
Overview
Catchment | Genoa River |
---|---|
Site | Davis Creek - Pipeline (Watertrust) Road EG_DAV030 |
Date and Time | Monday 6th September 2004 12:50pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 182 | 5.5 | 0.015 | 16.5 | 11 | 14 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
creek flowing, filled to the top of bank, red-ochre color. Rained heavily previous 2 days. P test difficultto read highly colored sample
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au