Waterwatch Data Portal
WG_PER003 Perry River @ Benworden Bridge Pool
18 April 2009
Site visit details
Overview
Catchment | Thomson River |
---|---|
Site | Perry River @ Benworden Bridge Pool WG_PER003 |
Date and Time | Saturday 18th April 2009 10:00am |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | GB Height m | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 6.4 | 0.015 | 21.8 | 17.7 | 28 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Weather Conditions - Sunny Last rainfall - during the last week Water flow - Not flowing Water appearance - stained brown Litter pollutants - paper drain not flowing deepest part of stream - up to 2m
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au