Waterwatch Data Portal
GB_MLD010 Reclaimed wetland on David Molds farm.
5 February 1999
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Reclaimed wetland on David Molds farm. GB_MLD010 |
Date and Time | Friday 5th February 1999 09:45am |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|
Sample | 880 | 7.2 | 0.053 | 29 | 25.5 | 78 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Water shallow in canal. Hole about 1/3rd full where sampling took place. Green azolla gradually starting to spread over canal. Many adult dragon flies visible and caught numerour mosquito fish.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au