Waterwatch Data Portal
GB_JIM010 Jims Gully at Creightons Creek
20 April 2008
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Jims Gully at Creightons Creek GB_JIM010 |
Date and Time | Sunday 20th April 2008 12:00pm |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
EC µS/cm | pH pH Units | Rain mm | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall approx 30mm in a storm on 24th March, few mm in 4 other falls. EC _ upper creek about the same as March, significantly lower downstream from RAM005. Turbidity much lower in april
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au