Site visit details

Overview

Catchment Goulburn River
Site Creightons Creek at Fay's GB_CRE012
Date and Time Sunday 15th June 2008 12:00pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units Water ° C P mg/L Turb NTU
Sample 190 12
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
rain 36mm since 18-05-08 mostly in 2nd week June EC Mostly about the same as may except PEA010 which is significantly lower.Turbidity lower than high levels of May? (John wrote June)

Creatures Waterwatch method

Image Species Score Quantity
Total bug score
Total abundance 0 - 35 35+
0 - 200 Poor Good
200+ Fair Very good
Total abundance: 0 Total score: 0 Overall rating: Poor

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au