Waterwatch Data Portal
GB_CRE002 Creightons Creek u/s of Threlful Creek
21 September 2008
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek u/s of Threlful Creek GB_CRE002 |
Date and Time | Sunday 21st September 2008 12:00pm |
Approved | Approved |
Physical Chemical Tests
E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 110 | 6.6 | 8.5 | 12 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall since 17th Aug 30mm in Aug, and 11 mm in Sept. EC slightly higher downstream, Turbidity lower upstream, variable downstream. pH mostly lower than July
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au