Waterwatch Data Portal
GB_JIM010 Jims Gully at Creightons Creek
21 September 2008
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Jims Gully at Creightons Creek GB_JIM010 |
Date and Time | Sunday 21st September 2008 12:00pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | Rain mm | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 750 | 6.9 | 16 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall since 17th Aug 30mm in Aug, and 11 mm in Sept. EC slightly higher downstream, Turbidity lower upstream, variable downstream. pH mostly lower than July abundant pondweed
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au