Waterwatch Data Portal
GB_JIM010 Jims Gully at Creightons Creek
15 August 2010
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Jims Gully at Creightons Creek GB_JIM010 |
Date and Time | Sunday 15th August 2010 12:00pm |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
EC µS/cm | pH pH Units | Rain mm | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall 100 mm plus since 18th July 2010. The minor flood level of the creek has had 2 consequences. The salt concentration is approximately evenly distributed along the creek. Similarly the turbidity is high with little variation, except for Pearsons.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au