Waterwatch Data Portal
GB_YEA018 Yea River U/S of Yea near GVW offtake
31 October 2010
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Yea River U/S of Yea near GVW offtake GB_YEA018 |
Date and Time | Sunday 31st October 2010 11:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 130 | 6.5 | 14.6 | 0.23 | 304 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Glenda Woods sampled. Almost peak. Water 1 metre below bridge
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au