Site visit details

Overview

Catchment Goulburn River
Site Hughes Creek at Bungle Boori ford GB_HUG008
Date and Time Monday 29th November 2010 08:10am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm Air ° C Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 100 14.7 50
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Gramlicks away so Rob Hayes tested site Big flood previous 24 hours Creeks still very dirty 114mm rain in Seymour since Thursday 25th

Creatures Waterwatch method

Image Species Score Quantity
Total bug score
Total abundance 0 - 35 35+
0 - 200 Poor Good
200+ Fair Very good
Total abundance: 0 Total score: 0 Overall rating: Poor

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au