Site visit details

Overview

Catchment Goulburn River
Site Murrindindi River at Bridge in Murrindindi GB_MUC010
Date and Time Monday 8th March 2010 08:45am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Water ° C P mg/L Turb NTU
Sample 119 10.2 95 6.4 17.8 0.16 150
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Total rain in previous 72 hours was 89 mm BF (Bankfull) High flow within channel capacity and in-stream habitats connected HF (High flow) Less than bankfull and in-stream habitats connected LF (Low flow) Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)

Creatures Waterwatch method

Image Species Score Quantity
Total bug score
Total abundance 0 - 35 35+
0 - 200 Poor Good
200+ Fair Very good
Total abundance: 0 Total score: 0 Overall rating: Poor

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au