Waterwatch Data Portal
GB_RUB020 Rubicon River at "Tumbling Waters" Taggerty-Thornton Road, Thornton
11 March 2010
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Rubicon River at "Tumbling Waters" Taggerty-Thornton Road, Thornton GB_RUB020 |
Date and Time | Thursday 11th March 2010 17:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | Rain mm | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 86 | 8.5 | 25 | 7.1 | 16.1 | 5 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Dani Beischer actually sampled Current flow descriptions for GBCMA: BF (Bankfull) High flow within channel capacity and in-stream habitats connected HF (High flow) Less than bankfull and in-stream habitats connected LF (Low flow) Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) NF1 (No flow 1) No continuous flow in channel and no pools NF2 (No flow 2) No continuous flow in channel and intermittent pools (in-stream habitats not connected) NF3 (No flow 3) No continuous flow in channel and continuous pools (in-stream habitats connected) NNF Near normal flows
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au