Waterwatch Data Portal
GB_CRE008 Creightons Creek d/s of Baronga Creek
15 November 2009
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek d/s of Baronga Creek GB_CRE008 |
Date and Time | Sunday 15th November 2009 12:00pm |
Approved | Approved |
Physical Chemical Tests
E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 180 | 6.9 | 0.04 | 11 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall:11mm between 18-10 and 15-11 Ec Sig higher at all sites due to evap in warm dry period. Turbidity generally lower.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au