Waterwatch Data Portal
GB_LIT025 Little River at Taggerty before confluence with Acheron R.
4 April 2009
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Little River at Taggerty before confluence with Acheron R. GB_LIT025 |
Date and Time | Saturday 4th April 2009 09:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 0.13 | 100 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Think this sample was collected as turbidity so high and Peter got Hodgy to test and do TP too
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au