Waterwatch Data Portal
GB_CRE011 Creightons Creek at Bartons Lane
20 December 2009
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek at Bartons Lane GB_CRE011 |
Date and Time | Sunday 20th December 2009 12:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | Rain mm | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 220 | 16.5 | 4 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall: ~80mm last 2 weeks Nov,17mm in Dec. Ec mostly lower following Nov rains. Turbidity similar to Nov.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au