Waterwatch Data Portal
GB_STE015 Steavenson River at Retreat Rd Bridge
27 April 2010
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Steavenson River at Retreat Rd Bridge GB_STE015 |
Date and Time | Tuesday 27th April 2010 16:35pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 102 | 11.1 | 37 | 6.8 | 11 | 0.03 | 8.1 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Dani Beischer sampled Local rainfall results not available. Rainfall over the previous 48 hours of the sampling period was very low as reflected in the turbidity results, however rainfall for April 24th was higher at Lake Eildon and Mangalore. BOM rainfall results 48 hours preceding 27th April: Lake Eildon: 6.6mm Kilmore Gap: 1.6mm Mangalore: 0.8mm BOM rainfall results 24th April Lake Eildon: 21mm Kilmore Gap: 6mm Mangalore: 26mm
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au