Waterwatch Data Portal
GB_CRE012 Creightons Creek at Fay's
21 March 2010
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek at Fay's GB_CRE012 |
Date and Time | Sunday 21st March 2010 12:00pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|
Sample | 240 | 7.6 | 9 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall:~100mm + between 5th and 8th March. Ec lower than Feb at all sites. Turbidity variable,CRE011 and CRE015 significantly lower.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au