Site visit details

Overview

Catchment Goulburn River
Site Taggerty River at the Buxton-Marysville Road GB_TAG015
Date and Time Tuesday 27th April 2010 16:30pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units Water ° C P mg/L Turb NTU
Sample 97 10.7 33 6.7 11 11
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Dani Beischer sampled Local rainfall results not available. Rainfall over the previous 48 hours of the sampling period was very low as reflected in the turbidity results, however rainfall for April 24th was higher at Lake Eildon and Mangalore. BOM rainfall results 48 hours preceding 27th April: Lake Eildon: 6.6mm Kilmore Gap: 1.6mm Mangalore: 0.8mm BOM rainfall results 24th April Lake Eildon: 21mm Kilmore Gap: 6mm Mangalore: 26mm

Creatures Waterwatch method

Image Species Score Quantity
Total bug score
Total abundance 0 - 35 35+
0 - 200 Poor Good
200+ Fair Very good
Total abundance: 0 Total score: 0 Overall rating: Poor

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au