Site visit details

Overview

Catchment Goulburn River
Site Howqua River at Tunnel Bend GB_HOW005
Date and Time Wednesday 16th June 2010 14:50pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Water ° C Coli orgs/100mL N mg/L P mg/L Turb NTU
Sample 10 7.3 2
Weather
Last rainfall
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Overcast and cool weather with the tributaries running slowly. Lauriston Girls School assisted with the sampling EC recorded as zero on result sheet - emailed Chris Clarke to check 12-7-10 Turb recorded as zero also - KJH entered as 2 NTU Chris replied that EC was meant to be 10 not zero 13-7-10

Creatures Waterwatch method

Image Species Score Quantity
Total bug score
Total abundance 0 - 35 35+
0 - 200 Poor Good
200+ Fair Very good
Total abundance: 0 Total score: 0 Overall rating: Poor

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au