Waterwatch Data Portal
GB_BAR010 Baronga Creek at Creightons Creek
18 April 2010
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Baronga Creek at Creightons Creek GB_BAR010 |
Date and Time | Sunday 18th April 2010 12:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | Coli orgs/100mL | P mg/L | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 140 | 9 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall ~60mm end of March, and ~20mm early April EC upper creek is same as March, lower part of creek has lower EC than March Turbidity much the same as March
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au