Waterwatch Data Portal
GB_JIM010 Jims Gully at Creightons Creek
21 November 2010
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Jims Gully at Creightons Creek GB_JIM010 |
Date and Time | Sunday 21st November 2010 12:00pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | Rain mm | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|
Sample | 330 | 6.6 | 25 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall: ~ 75mm in last two weeks of October, and ~ 14mm in first three weeks of november EC: slightly higher than October, Turbidity mostly lower. pH meter batteries flat so data for most of samples collected on Sunday could not be recorded as need to be measured within a few hours.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au