Waterwatch Data Portal
CO_BAR161 Barwon River @upper Break, upstream of Breakwater Rd bridge west bank
24 March 2009
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Barwon River @upper Break, upstream of Breakwater Rd bridge west bank CO_BAR161 |
Date and Time | Tuesday 24th March 2009 07:10am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 2900 | 8 | 0.08 | 18 | 19 | 20 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Observations: Description of site: close to busy road, ground vegetation and trees adjacent to river, some refuse pollution in river. A lot of reeds in the water. River dark colour, some refuse pollution in river, weeds in the river.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au