Waterwatch Data Portal
CO_WAU012 Waurn Ponds Creek @ Cobbin Farm
14 June 2009
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Waurn Ponds Creek @ Cobbin Farm CO_WAU012 |
Date and Time | Sunday 14th June 2009 09:30am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 85 | 9.4 | 7.7 | 0.13 | 10.5 | 8.5 | 0.038 | 14 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Aslo sampled with E.Medlyn Weather was cloudy During the last 24 hours there had been 2mm of rain Water appearance was clear Estimated flow was moderate Depth indicator was 51cm to 1 meter Litter pollutants found: plastic, paper, polystyrene, cans and others (road sign) EC meter not calibrating to to 2000 as it only went to 1500 so Ec data was not entered
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au