Waterwatch Data Portal
WG_FRR010 Franklin River lower South Gippsland Highway. NCI Project
14 December 2006
Site visit details
Overview
Catchment | South Gippsland |
---|---|
Site | Franklin River lower South Gippsland Highway. NCI Project WG_FRR010 |
Date and Time | Thursday 14th December 2006 12:08pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | Hard mg/L | pH pH Units | Pupi per visit | rP mg/L P | Air ° C | Water ° C | Tota mg/L | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 349 | 7.09 | 0.033 | 33.1 | 17.3 | 0.056 | 4.22 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Willow removal at test site. Mainly downstream at this stage
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au