Waterwatch Data Portal
NC_BGO200 Bendigo Ck, Goornong (P.S.)
30 April 1998
Site visit details
Overview
Catchment | Loddon River |
---|---|
Site | Bendigo Ck, Goornong (P.S.) NC_BGO200 |
Date and Time | Thursday 30th April 1998 12:00pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | rP mg/L P | Turb NTU | |
---|---|---|---|
Sample | 1100 | 0.49 | 80 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Medium level. Medium flow. During April significant rain fell throughout the catchment signalling the autumn break. There was relatively little runoff into streams however, as most of the gentle rain was absorbed by dry soils.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au