Site visit details

Overview

Catchment Yarra River
Site Valley Creek. First pool after drain at top of Valley Reserve, Mt Waverley ME_YVA002
Date and Time Sunday 27th September 2009 14:00pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 240 7.3 9 9.5
Weather n/s
Last rainfall Last 7 days
Flow estimate n/s
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
There has been a large quantity of rain over the past week (in excess of 50mm). The heavy recent rains have also caused the higher than usual conductivity and turbidity readings at most sites.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au