Waterwatch Data Portal
ME_ESU300 Sunshine Creek at Frankston school steps bridge, Mt Martha
4 April 2011
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Sunshine Creek at Frankston school steps bridge, Mt Martha ME_ESU300 |
Date and Time | Monday 4th April 2011 13:20pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 7 | 4300 | 0.06 | 7.5 | 15 | 14 | 7 |
Weather | Overcast |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | Trickle |
Water Appearance | |
Stream depth | 20.00 |
Stream width | 4.00 |
Hazards | |
Litter/Pollutants |
Water still tannin stained with a little foam on the surface. Water slightly clearer than last month. Slow trickle and water level lower. 1.8mm rainfall last week.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au