Waterwatch Data Portal
ME_YDI800 Diamond Creek @ Edendale Environment Centre footbridge
22 November 2009
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek @ Edendale Environment Centre footbridge ME_YDI800 |
Date and Time | Sunday 22nd November 2009 16:15pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 19.6 | 19.2 | 150 |
Weather | Rain |
---|---|
Last rainfall | Raining now |
Flow estimate | Fast |
Water Appearance | |
Stream depth | 130.00 |
Stream width | 7.40 |
Hazards | |
Litter/Pollutants |
23mm of rain in last 24 hours. CHANGES SINCE LAST TIME Rain! More turbid. Pole which has been thrown into the river has been removed. WHAT STANDS OUT TODAY? Water level had been higher - streamside vegitation flattened. OTHER Pair of Black Ducks with 7 chicks. Dark silt and plant debris entering Yarra at confluence, 7.10AM
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au