Site visit details

Overview

Catchment Werribee River
Site Toolern Creek at Big Red, downstream of Western Freeway in Melton ME_WTO620
Date and Time Sunday 21st May 2006 00:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample 0 33.5339 3.5 186 0.01 8.4 13.4 80
Weather
Last rainfall More than a week ago
Flow estimate
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

rainfall not specified. Nitrate was <0-3mg/l RQ flex method (is this reactive phosphate?)

Habitat

Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
0

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au