Waterwatch Data Portal
ME_EYA100 No. 5 Drain (at No. 5 Drain Road) Yallock Creek
18 November 2006
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | No. 5 Drain (at No. 5 Drain Road) Yallock Creek ME_EYA100 |
Date and Time | Saturday 18th November 2006 11:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 3.7 | 998 | 0 | 7.36 | 130 |
Weather | Sunny |
---|---|
Last rainfall | Last 3 days |
Flow estimate | Slow |
Water Appearance | |
Stream depth | 5.00 |
Stream width | 1.50 |
Hazards | |
Litter/Pollutants |
almost zero flow, worst apperance since we've started monitoring. First time we've noticed a smell. (Julia- Data enterer, added 11am as time as it was not specified on data sheet)
Creatures Waterwatch method
Total bug score | ||
---|---|---|
Total abundance | 0 - 35 | 35+ |
0 - 200 | Poor | Good |
200+ | Fair | Very good |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au