Waterwatch Data Portal
ME_EBU100 Bunyip Main Drain at Cora Lynn
20 May 2006
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Bunyip Main Drain at Cora Lynn ME_EBU100 |
Date and Time | Saturday 20th May 2006 10:15am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 7.5 | 241 | 0.02 | 7.13 | 11.9 | 12 |
Weather | Sunny |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | 0.38 m/s |
Water Appearance | |
Stream depth | 1.20 |
Stream width | 5.00 |
Hazards | |
Litter/Pollutants |
2 mm rainfall in last 24 hours.
Creatures Waterwatch method
Total bug score | ||
---|---|---|
Total abundance | 0 - 35 | 35+ |
0 - 200 | Poor | Good |
200+ | Fair | Very good |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au