Waterwatch Data Portal
ME_EBA240 Balcome Creek at Two Bays Road (site 2), Mt Eliza
20 July 2008
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Balcome Creek at Two Bays Road (site 2), Mt Eliza ME_EBA240 |
Date and Time | Sunday 20th July 2008 14:00pm |
Approved | Approved |
Physical Chemical Tests
No physical chemical tests recorded on this visit
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample |
Weather | Overcast |
---|---|
Last rainfall | More than a week ago |
Flow estimate | Normal base flow |
Water Appearance | |
Stream depth | 35.00 |
Stream width | |
Hazards | |
Litter/Pollutants |
last rainfall not specified, all sites have lots of water, flowing nicely. Site 2 upstream 35cm, water measured by drain water level (steady flow), downstream approx 58cm. Some rubbish downstream.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au