Site visit details

Overview

Catchment Yarra River
Site Darebin Creek, Dundas Street Drain or Cave Clan Drain (upstream footbridge and Dundas St wetland) Thornbury/Ivanhoe ME_YDA534
Date and Time Saturday 27th February 2010 11:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 10 1.2 2800 0.31 7.4 20 20
Weather Cloudy
Last rainfall More than a week ago
Flow estimate Normal base flow
Water Appearance
Stream depth 20.00
Stream width 1.00
Hazards
Litter/Pollutants
Conductivity: Overrange reading diluted by 50% (1:1) to estimate value of 2800uS/cm Ammonium: Overrange result obtained by dilution by 50% by 33% by 33%, 1.21*2*3*3=21.78mg/L, value entered as 10mg/L in database as this is the database maximum allowable value for ammonium, actual measured value is 21.78mg/L.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au