Waterwatch Data Portal
ME_YDI800 Diamond Creek @ Edendale Environment Centre footbridge
10 December 2009
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek @ Edendale Environment Centre footbridge ME_YDI800 |
Date and Time | Thursday 10th December 2009 13:50pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 25 | 17 | 400 |
Weather | partly cloudy |
---|---|
Last rainfall | Last 3 days |
Flow estimate | Fast |
Water Appearance | |
Stream depth | 100.00 |
Stream width | 5.90 |
Hazards | |
Litter/Pollutants |
Similar "falling levels" situation. Build up of branches etc. almost blocking flow competely - only a 600mm gap for water flow. A lot of vegatative matter in water Flow had fallen 1m. Water appeared bubbly. 21.2mm of rain. Litter included a ball and a milk crate.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au