Waterwatch Data Portal
ME_EME993 Merricks Beach Drainage: Foam St drain as it exits pip under Surf St into foreshore
22 November 2009
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Merricks Beach Drainage: Foam St drain as it exits pip under Surf St into foreshore ME_EME993 |
Date and Time | Sunday 22nd November 2009 18:00pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.01 | 100 | 0.1 | 8 | 7.3 | 15 | 28 |
Weather | Showers |
---|---|
Last rainfall | Last 24 hrs |
Flow estimate | Temporary |
Water Appearance | |
Stream depth | 10.00 |
Stream width | 0.30 |
Hazards | |
Litter/Pollutants |
ecoli - 16,000
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au