Site visit details

Overview

Catchment Bunyip River
Site Merricks Beach Drainage: Foam St drain as it exits pip under Surf St into foreshore ME_EME993
Date and Time Sunday 22nd November 2009 18:00pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.01 100 0.1 8 7.3 15 28
Weather Showers
Last rainfall Last 24 hrs
Flow estimate Temporary
Water Appearance
Stream depth 10.00
Stream width 0.30
Hazards
Litter/Pollutants
ecoli - 16,000

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au