Site visit details

Overview

Catchment Bunyip River
Site Balcombe Creek at Augusta St Bridge, Mt Martha ME_EBA900
Date and Time Saturday 7th November 2009 09:15am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0 6 0.05 0.05 7.1 23 15 10
Weather Sunny
Last rainfall Last 3 days
Flow estimate None
Water Appearance
Stream depth 150.00
Stream width 8.00
Hazards
Litter/Pollutants
1.Estuary entrance is closed for the past week 2.Rainfall and flushing out of creek has resulted in lower EC levels 3.Black sludge recorded 3 months ago has now dissappeared, being "flushed" out to sea with large rainfall events over that period. 4. Macroinvertebrate count is still poor and has been for last 3 months.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au