Waterwatch Data Portal
ME_ESW100 Sweetwater Creek, End of Fenton Street (bridge over creek)
19 February 2007
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Sweetwater Creek, End of Fenton Street (bridge over creek) ME_ESW100 |
Date and Time | Monday 19th February 2007 10:30am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 6 | 700 | 0.05 | 6.6 | 23 | 21.8 |
Weather | Overcast |
---|---|
Last rainfall | Last 3 days |
Flow estimate | Slow |
Water Appearance | |
Stream depth | 5.00 |
Stream width | 1.00 |
Hazards | |
Litter/Pollutants |
Water definately murkier than last testing day. There has been little rainfall though in the last few weeks. The water weeds have grown more, stopping the flow of water.
Creatures Waterwatch method
Total bug score | ||
---|---|---|
Total abundance | 0 - 35 | 35+ |
0 - 200 | Poor | Good |
200+ | Fair | Very good |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au