Waterwatch Data Portal
ME_DWA100 Wadsley Drain Frankston Fwy South of pump
3 December 2005
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Wadsley Drain Frankston Fwy South of pump ME_DWA100 |
Date and Time | Saturday 3rd December 2005 10:30am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 8 | 1000 | 0.01 | 8.6 | 7.4 | 10 |
Weather | Overcast |
---|---|
Last rainfall | Raining now |
Flow estimate | Permanent |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
34.66mm in Morabbin to 9:00am 0mm in Frankston to 9:00am
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au