Site visit details

Overview

Catchment Bunyip River
Site Dingley Drain ME_DBR005
Date and Time Tuesday 25th November 2008 08:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 6 300 0.25 7.2 18 13.9 45
Weather no observations taken
Last rainfall More than a week ago
Flow estimate Normal base flow
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
no observations taken phosphorus higher than 0.25 colorometer 0.5

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au