Site visit details

Overview

Catchment Bunyip River
Site Sweetwater Creek, End of Fenton Street (bridge over creek) ME_ESW100
Date and Time Monday 28th August 2006 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample 1000 0.02 6.8 16 13 5
Weather Cloudy
Last rainfall Last 3 days
Flow estimate Fast
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants

Habitat

Migrated from old Melbourne data
Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Poor 2 Fair 6 Poor 4 VeryPoor 1 Poor 4 Good 17

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au