Site visit details

Overview

Catchment Bunyip River
Site Sweetwater Creek, End of Fenton Street (bridge over creek) ME_ESW100
Date and Time Friday 8th June 2007 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample 10 1300 0.02 7.5 15 10.5 10
Weather Sunny
Last rainfall Last 3 days
Flow estimate Slow
Water Appearance
Stream depth
Stream width 2.00
Hazards
Litter/Pollutants
Water level very low.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au