Waterwatch Data Portal
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Boggy Creek at Lexton Drive ME_EBO300 |
Date and Time | Friday 9th November 2007 14:10pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 6 | 400 | 0.02 | 7.7 | 22 | 22 | 10 |
Weather | Sunny |
---|---|
Last rainfall | More than a week ago |
Flow estimate | Fast |
Water Appearance | |
Stream depth | 5.00 |
Stream width | |
Hazards | |
Litter/Pollutants |
Measured at end of pipe. Stream goes into short pipe then into pond and under road.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au