Waterwatch Data Portal
ME_ESU300 Sunshine Creek at Frankston school steps bridge, Mt Martha
5 March 2008
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Sunshine Creek at Frankston school steps bridge, Mt Martha ME_ESU300 |
Date and Time | Wednesday 5th March 2008 10:20am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 4 | 5100 | 0.1 | 7.4 | 20 | 20 | 10 |
Weather | Sunny |
---|---|
Last rainfall | More than a week ago |
Flow estimate | None |
Water Appearance | |
Stream depth | 5.00 |
Stream width | 1.00 |
Hazards | |
Litter/Pollutants |
The area has been cleared all around of woody weeds, sallow wattle, ti-tree felled, sweet pittosporum, dandelions and sweet vernal grass, blackberries cut and painted, hand weeded under Melbourne Water grant. Fox den located in vicinity, Swamp Rats at home. Looking good. Maidenhair ferns, microlenae, red fruiting sedge, melaleuca scrub spreading. Branches have been temporarily piled in the creek in order to slow down the water discharges from Waterview Ridge, as it has not been connected yet. Two rain events (over 100mls) have deposited major amounts of silt from that site.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au