Site visit details

Overview

Catchment Yarra River
Site ME_YWR010
Date and Time Sunday 2nd October 2005 11:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units Air ° C Water ° C Turb NTU
Sample 5.7 720 7.5 16 40
Weather Sunny
Last rainfall Last 7 days
Flow estimate Slow
Water Appearance
Stream depth 100.00
Stream width
Hazards
Litter/Pollutants
Closest drain 50m from monitoring site, pipe with 900m diameter (this obviously a mistake probably 900mm).

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au