Waterwatch Data Portal
ME_YDI900 Diamond Creek@Billabong (Barak Bushland) Eltham
13 April 2004
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek@Billabong (Barak Bushland) Eltham ME_YDI900 |
Date and Time | Tuesday 13th April 2004 11:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 210 | 3 | 8 | 24 | 18 | 200 |
Weather | Sunny |
---|---|
Last rainfall | More than a week ago |
Flow estimate | None |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Very stagnant water looks slimy. Dried up with only a couple of ponds. No bug sample was taken sampler thought site was inappropriate because of dried up nature of the area. Very high phosphate reading greater than 3, inability to set meter to bow tie, blu/grey color.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au