Site visit details

Overview

Catchment Bunyip River
Site Tanti Creek upstream of Estuary (land side of Esplanade) ME_ETN900
Date and Time Friday 16th November 2007 16:10pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb FAU Turb NTU
Sample 6.6 0.05 8.4 25 26.3
Weather Sunny
Last rainfall More than a week ago
Flow estimate Slow
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
Some suspended solids near rocks and banks. Creek flooded - 200mm rain. Debris from recent rain storm 04/11 - mulch sticky, pieces of wood. Downstream - shopping trolleys, plastic, lots of debris from trees, mud, erosion of banks and recent plantings along banks below Becton development. Large tree fallen over the protective fencing.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au