Waterwatch Data Portal
ME_YBA500 Banyule Creek @ footbridge Banyule Flats Reserve
24 April 2007
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Banyule Creek @ footbridge Banyule Flats Reserve ME_YBA500 |
Date and Time | Tuesday 24th April 2007 14:00pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0 | 4.4 | 460 | 0.05 | 7.8 | 17 | 14 | 10 |
Weather | Sunny |
---|---|
Last rainfall | Last 3 days |
Flow estimate | Flowing |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Joanne Lockwood carried out Phys/Chem parameters this month to gain experience with her data reporting and use of chemicals. As she had not carried out DO test to date, I performed the test for Jo looking on for future reference. Not much in the way of diversity or bug activity except for the several damselflies I collected (data entry note: this information does not match the bug sample results). See picture supplied with this report. The creek did encounter a good flow of water from saturday afternoon which flowed down from the Simpson Barracks. August monitoring will see out students back at the creek for bug sampling while I do the water testing.
Creatures Waterwatch method
Total bug score | ||
---|---|---|
Total abundance | 0 - 35 | 35+ |
0 - 200 | Poor | Good |
200+ | Fair | Very good |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au